back to the island project

Back to the small cabin project on the Island, footing piers are in at the building site: Now floor framing can begin and then walls… http://huismanconcepts.com/ ______________________________ _______________________________________ _________________ This is a great editorial in the Ely Timberjay this past week:  http://www.timberjay.com/stories/Up-North-Jobs,11138  I don’t always agree with Marshal, but is this case he says it … Read more

Continuing the start of this project: Pouring the basement floor slab on top of the foam insulation and the “In-floor” heating tubes. Going up from there with the ICF forms …they stack up like life sized “Legos”… Here the insulated concrete form walls are completed and have been filled with concrete. Ready for a subfloor … Read more

Baseball for Ely’s American Legion team this weekend so far: ‏   http://elylegionbaseball.blogspot.com/2013/07/ely-reaches-district-finals.html?spref=tw  http://huismanconcepts.com/

To continue from last weeks post:The next steps are filling in and compacting the inside area under the basement slab and then laying the foam insulation that will force the heat from the in-floor heating system up into the house. Here the dirt is being brought in to the inside of the footings and compacted. … Read more