In-floor heat tubes

A bit more progress on the timber frame project: We had the heat tubes installed last week, ready for the over-pour.Because of the snow storm on Tuesday in most of the state, our over-pour guys canceled.We never did get the storm they were predicting here but I know many parts of the state got hit … Read more

March 16th, 2014

The drywall hanging is well underway here now that the electrical and plumbing rough-in is, for the most part, completed. Here are some shots of the drywall being installed around the timber frame structure: In some of the above shots you can also see the loft floor has been installed. In this particular home, the … Read more

Progress, interior work

After suffering through some cold work on the outside of the building, the plumbing and electrical are far enough along that we can start some drywall work. I try to take as many pictures of the plumbing and electrical in the walls before they are covered. They are often handy to have for future reference. … Read more

Finished kitchen

Back in November we finally finished a remodel project that was, for the most part, completed except for the kitchen. We had been waiting for some custom made tile for the back-splash behind the soapstone counter-tops. I just realized I never did get around to posting these completed pictures. The tile was custom made in … Read more

Table Conversation

“Table Conversation” 13″ x 20″, pencil drawing by John Huisman. A quick sketch of the boys, my two oldest, in relaxed conversation at the table. _____________________________________________ ____________________________ http://huismanconcepts.com/artwork-gallery/

a wolf story

Last Friday January 3rd, I was heading to town and saw a wolf with coming out of the sandpit two miles south of Ely on Highway 21. He seemed to pause and not be moving so fast so I turned around and went back. As I approached, he came down the bank into the road … Read more