Continuing the start of this project:

http://huismanconcepts.com/
Pouring the basement floor slab on top of the foam insulation and the “In-floor” heating tubes.
http://huismanconcepts.com/
Going up from there with the ICF forms

http://huismanconcepts.com/
…they stack up like life sized “Legos”…
Lake home construction, http://huismanconcepts.com/
Here the insulated concrete form walls are completed and have been filled with concrete. Ready for a subfloor to be built.
Ely lake home, http://huismanconcepts.com/
Floor trusses have been put in place on top of the basement/foundation walls.
Ely lake home, http://huismanconcepts.com/
…and the sheathing is finished. This is the main floor of the house…

The house is now ready for the timber frame and wall structure.

http://huismanconcepts.com/