Continuing the start of this project:
![huisman, ely mn http://huismanconcepts.com/](http://2.bp.blogspot.com/-gebheF33juU/UfxeHF5K37I/AAAAAAAAFBk/Si-UmqD3x1Q/s320/Pouring+the+slab.JPG) |
Pouring the basement floor slab on top of the foam insulation and the “In-floor” heating tubes. |
![http://huismanconcepts.com/ http://huismanconcepts.com/](http://3.bp.blogspot.com/-bPErTrwVNos/Ufxd4v1qhRI/AAAAAAAAFBU/XnatGIVazzg/s320/Going+up+with+ICF+walls.JPG) |
Going up from there with the ICF forms |
![John Huisman http://huismanconcepts.com/](http://4.bp.blogspot.com/-TSZNRCZDiQI/UfxeWxN28UI/AAAAAAAAFB4/Ty2WXGvQZVo/s320/Up+with+the+ICF+walls.JPG) |
…they stack up like life sized “Legos”… |
![Ely lake home construction, http://huismanconcepts.com/ Lake home construction, http://huismanconcepts.com/](http://3.bp.blogspot.com/-JKlOf8jOL-M/Ufxd6tPp9dI/AAAAAAAAFBY/eeMcCybj_9Q/s320/ICF+walls+complete+and+poured+with+concrete.JPG) |
Here the insulated concrete form walls are completed and have been filled with concrete. Ready for a subfloor to be built. |
![Ely lake home, http://huismanconcepts.com/ Ely lake home, http://huismanconcepts.com/](http://3.bp.blogspot.com/-6JS9YB-Lpfs/UfxdvNzaMpI/AAAAAAAAFBI/XHLhMD5Djzk/s320/Floor+trusses+in+place+%25281%2529.JPG) |
Floor trusses have been put in place on top of the basement/foundation walls. |
![Ely lake home, http://huismanconcepts.com/ Ely lake home, http://huismanconcepts.com/](http://1.bp.blogspot.com/-WskjrW5X7b8/UfxeUcPvq5I/AAAAAAAAFBw/i9xQnbkkDUE/s320/Subfloor+sheathing+done.JPG) |
…and the sheathing is finished. This is the main floor of the house… | | |
The house is now ready for the timber frame and wall structure.
http://huismanconcepts.com/